contact us

x

Contact Us

    casestudies

    Platinum Mine

    uet

    Sector:

    Mining

    uet

    Installation:

    Cooling Tower System (UET – CT)

    uet

    Purpose:

    Scale in Heat Exchangers of Cooling Towers

    uet

    Customer:

    Platinum mining company

    uet

    COMPARING TREATMENT SYSTEMS

    uet

    A platinum mining company in South Africa was using chemicals to treat hard water but found significant scale formation in the heat exchanger of one of its cooling towers after just one year of operation. They engaged UET to install their alternative treatment system in a similar cooling tower, in order to compare the efficiency of UET’s non-chemical treatment technology with chemically-treated water. After one year of operation, inspection of the two heat exchangers showed that UET’s technology kept the heat exchangers in one cooling tower clean and free of scale, and dramatically cleaner than the heat exchangers in the cooling tower treated by chemicals.

    As a result of this experiment, the company installed UET systems in further cooling towers. They were able to reduce their consumption of expensive treated water, cut their maintenance and cleaning costs and associated down-time, and eliminate their use of hazardous chemicals and their associated costly logistics.

    Savings Table

    0 %
    Total Water
    Savings
    0 %
    Total Cost
    Savings
    0 %
    Total Chemical
    Reduction

    80000

    m³/year
    Total Water Savings

    uet

    180000

    $/year
    Total Cost Savings

    uet

    100

    tons/year
    Total Chemical Reduction

    uet

    Sign in

    HEBREW

    COMING SOON