Siemens Solar Power Plant

uet

Sector:

Power Plant Generation

uet

Installation:

Cooling Tower System (UET – CT)

uet

Purpose:

Poor Water Quality & Concentration Cycles

uet

Customer:

Siemens

uet

POWER PLANT SOLUTIONS

uet

Siemens hired UET to solve problems of poor water quality and improve concentration cycles at a major solar power plant in Lebrija, Spain.  UET units were installed in their cooling towers and the crew was trained in their operation.  After the 2nd year and 6th year of operation, the heat exchangers were inspected and found to be free of scale deposits.   During 2015, the UET units removed 1,833Kg of scale that could have settled in the water system!

Today, the plant is saving more than 250,000 m³ of water and half-a-million dollars per year by reducing its chemical, servicing and water costs.

Water Saving Table

0 %
Total Water
Savings
0 %
Total Cost
Savings
0 %
Total Chemical
Reduction

250000

m³/year
Total Water Savings

uet

500000

$/year
Total Cost Savings

uet

200

tons/year
Total Chemical Reduction